Installing Lowe's Pegboard: Step-by-Step Guide
Mark studs and hang the support boards using a stud finder , mark the studs on the wall. Determine the number of furring strips you will need based on the size of your board. 16 jun 2017 · step 1: To install pegboard, first attach 1x4 boards over the studs in your wall; Ideal for displaying tools, objects, clothing or necessities, the wooden pegboard is designed to go the distance and.
Ideal for displaying tools, objects, clothing or necessities, the wooden pegboard is designed to go the distance and. Mark studs and hang the support boards using a stud finder , mark the studs on the wall. Then attach the pegboard to the boards.